Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions - EdilKamin IRIS Installation, Betrieb Und Wartung

Pellet-heizofen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
COVERINGS
Model with ceramic or ollite side covering.
Covering parts list:
• 1 side tiles (4 pcs)
• 2 side aluminium panels (4 pc)
• 3 cast iron top
• 4 pellet hopper cover
• 5 top tiles
• 6 cast iron base
After positioning the frame according to the
instructions shown in the

INSTALLATION INSTRUCTIONS

chapter, proceed as follows in the order shown:
• remove cast iron top by unscrewing the 16 screws
under the top ceramic tiles (5) and the two screws
located at the rear (y),
• remove the aluminium side panel (2) fastening
component (7),
• slip the four ceramic side components into the
aluminium side guides from above,
• replace the fastening component (7),
• replace the top and fasten it.
INSTRUCTIONS TO APPLY THE GASKET TO
THE CERAMIC TILES
If the side ceramic tiles vibrate during operation,
you can apply the gasket supplied by following
these instructions:
• Loosen the fastening screws found under the tiles
of the cast iron top and the 2 screws of the rear
panel
• Move the cast iron top sideways, leaving enough
space for the ceramic tiles to pass
• Carefully remove the ceramic tiles from the sides,
ensuring not to damage them
• Cut 4 pieces of about 3 cm from the 8 x 1 black
adhesive gasket, supplied with the documentation,
and apply them to the back of the ceramic tiles in
the positions shown in the figure, indicated by an *.
• Insert the ceramic tiles in place
• Put the cast iron top back into its central position
and fasten the screws previously removed
- 19
-

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis