Herunterladen Inhalt Inhalt Diese Seite drucken

Sainlogic FT0835 Benutzerhandbuch Seite 13

Professionelle funkwetterstation
Vorschau ausblenden Andere Handbücher für FT0835:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Note: If the power adapter is plugged in, BL ON will display in the
time area for three seconds when powered up. Conversely, if the power
adapter is not plugged in, BL OFF will be displayed.
3.4.2 Sensor Operation Verification
The following steps verify proper operation of the sensors prior to
installing the sensor array.
1. Verify proper operation of the rain gauge. Tip the sensor array
back and forth several times. You should hear a "clicking"sound
within the rain gauge. Verify the rain reading on the display console
is not reading 0.00. Each "click"represents 0.3mm of rainfall.
2. Verify proper operating of the wind speed. Rotate the wind cups
manually or with a constant speed fan. Verify the wind speed is not
reading 0.0.
3. Verify proper operation of the indoor and outdoor temperature.
Verify the indoor and outdoor temperature match closely with the
console and sensor array in the same location
(about 3m apart). The sensors should be within 2°C (the accuracy
is ±1°C). Allow about 30 minutes for both sensors to stabilize.
4. Verify proper operation of the indoor and outdoor humidity. Verify
the indoor and outdoor humidity match closely with the console and
sensor array in the same location (about 3m apart). The sensors
should be within 10% (the accuracy is ± 5%). Allow about 30
minutes for both sensors to stabilize.
4. Weather Station Installation
4.1
Pre Installation Check. Before installing your weather station
in the permanent location, we recommend operating the weather
station for one week in a temporary location with easy access. This
will allow you to check out all of the functions, insure proper operation,
and familiarize you with the weather station and calibration procedures.
This will also allow you to test the wireless range of the weather station.
4.2 Location Survey
Perform a site survey before installing the weather station. Consider the
following:
1. You must clean the rain gauge once per year and change the
batteries every year. Provide easy access to the weather station.
12

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Sainlogic FT0835

Inhaltsverzeichnis