Herunterladen Inhalt Inhalt Diese Seite drucken

VERTO 50G291 Betriebsanleitung Seite 11

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 13
CONSTRUCTION AND USE
Drill is a battery powered tool. Drive consists of a DC commutator
motor with planetary gear. Drill is designed for screwing in and out
screws and bolts in wood, metal, plastics and ceramics, and for
drilling holes in these materials. Cordless, battery- powered power
tools are especially useful for works in interior furnishing, adaptation
of premises etc.
WARNING! Use the power tool according to the manufacturer's
instructions only.
DESCRIPTION OF DRAWING PAGES
Below enumeration refers to the device elements depicted on the
drawing pages of this manual.
1. Quick-release chuck
2. Torque adjustment ring
3. Direction selector switch
4. Battery
5. Battery lock button
6. Switch
7. Lighting
8. Gear switch
9. Connection socket
10. Charger
11. LED diodes indicating the battery charging status.
*Differences may appear between the product and drawing.
EQUIPMENT AND ACCESSORIES
1. Battery
- 2 pc
2. Charger
- 1 pc
3. Screwdriver bit
- 6 pc.
4. Bit holder
- 1 pce
5. Drills
- 6 pcs
6. Carrying case
- 1 pce
PREPARATION FOR OPERATION
REMOVING AND INSERTING THE BATTERY
• Set the direction selector switch (3) in middle position.
• Push battery lock button (5) and slide out the battery (4) (fig. A).
• Insert charged battery (4) into the handle holder, you should
hear when the battery lock button (5) snaps.
BATTERY CHARGING
• Drill is supplied with partially charged battery. The battery should
be charged in ambient temperature between 4°C and 40°C. In the
event of a longer storage of the battery, it is recommended to
check the state of its charge and possibly recharge it every few
months.
• Remove the battery (4) from the drill (fig. A).
• Connect the charger (10) to mains socket (230 V AC).
• Place the battery (4) by sliding it into the charger socket (9) (Fig.
B).
When the charger is connected to power supply, the LED (11) of
the charger (10) turns on in green. LED lighting scheme is
described below.
• Diode on green – indicates voltage on the connector.
• Diode on red – charging is in progress (once the battery is
connected to the charger).
• Diode on green again – the battery is fully charged.
Once the battery has been charged, the LED diode (11) is lit green
until you disconnect the charger from mains network.
Batteries heat up strongly when charging. Do not operate just
after charging – wait for the battery to cool down to room
temperature. It will prevent battery damage.
SPINDLE BRAKE
Drill is equipped with electronic brake that stops the spindle
immediately after the switch button (6) is released. The brake
ensures precision when screwing or drilling and prevents free
spindle rotation after switching off.
OPERATION / SETTINGS
SWITCHING ON / SWITCHING OFF
Switching on – press the switch button (6).
Switching off – release the switch button (6).
Each time the switch button (6) is pressed, the LED diode (7) lights
up to illuminate the workplace.
ROTATIONAL SPEED CONTROL
Increase or reduce pressure on the switch button (6) to adjust
drilling or driving speed while operating. Speed adjustment allows
for a soft start, which prevents dill slipping when drilling holes in
gypsum or glaze, and allows for operation control when screwing in
and out.
OVERLOAD CLUTCH
Set the torque adjustment ring (2) in appropriate position to
permanently set overload clutch to defined torque value. When the
set torque is reached, overload clutch disconnects automatically. It
prevents screwing screws too deep or damaging the drill.
TORQUE ADJUSTMENT
• Different screws and materials require different torque to be
applied.
• The bigger the number corresponding to given position, the
bigger is the torque (fig. C).
• Set the torque adjustment ring (2) to appropriate torque value.
• Always start operation with low torque.
• Increase the torque gradually until obtaining desired results.
• Use higher settings to unscrew screws.
• When drilling, choose setting marked with the drill symbol. The
torque is the greatest with this setting.
• Knowledge how to choose appropriate torque setting comes
with practice
Setting the torque adjustment ring in the drilling position
deactivates the overload clutch.
WORKING TOOL INSTALLATION
• Set the direction selector switch (3) in the middle position.
• Hold the rear ring of the quick release chuck (1) and turn the
front ring counter clockwise. Turn until jaws spread properly and
allow to insert drill or driver bit (fig. D).
• Hold the rear ring of the quick release chuck (1), turn front ring
clockwise and tighten firmly to install work tool.
Deinstallation of tool is similar to installation, only the sequence of
actions is reversed.
Make sure the tool position is correct when installing drill or
driver bit in the quick release chuck. Use additional magnetic
adapter as an extension when using short driver bits.
LEFT – RIGHT DIRECTION OF ROTATION
Choose direction of spindle rotation with the direction selector
switch (3) (fig. E).
Clockwise rotation – set the direction selector switch (3) to the
extreme left position.
Counter-clockwise rotation – set the direction selector switch (3)
to the extreme right position.
10

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis