Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Machine For Wet Machining - VHF S5 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 65
EN 36
F
. 42 I
IG
NSTALLING THE IONIZER COVER
)
MARKED ORANGE
The ionizer cover is held in place by magnets.
6.8 Preparing the machine for w et
machining
For wet machining, your S5 requires the vhf wet
grinding module. The wet grinding module and the
required cooling lubricant Tec Liquid Pro are available
from customer service.
Before you operate the machine with the vhf
wet grinding module, read all documents
provided with the module.
The operating instructions are delivered with the vhf
wet grinding module. They are also available for down-
load at: https://www.dentalportal.info/NO1
You prepare the machine for wet machining as follows:
1. Install the wet grinding module and connect it to
the machine.
2. Clean the wet grinding module and fill it with suf-
ficient cooling liquid.
3. Switch on the machine at the main power switch.
4. Open the working chamber door.
5. Mount the ionizer cover.
6. Clean the working chamber.
7. Close the working chamber door.
8. Start DENTALCNC on the CAM computer.
9. If DENTALCNC asks you to unlock the wet grinding
module, enter the unlock code that you received
with the module. If you did not receive an unlock
code, contact customer service.
10. If a tool is already inserted in the collet chuck, go to
step 18 (
  page 36
).
11. Select the following icon:
(
,
RECESSES MARKED BLUE
PINS
Original Operating Instructions:  S5
Version: 12/15/2021
S5 – Operation: Preparing jobs
The following happens:
a. The spindle moves to the tool change position.
b. A dialog window opens. DENTALCNC prompts
you to confirm the opening of the collet chuck.
12. CAUTION!Wear gloves.
13. Open the working chamber door.
14. Confirm the current message.
The following happens:
a. The collet chuck opens.
b. The current dialog window closes.
c. A dialog window opens.
15. Insert the tool into the collet chuck and hold it in
place. Be sure to insert the tool until the tool ring
reaches the tip of the collet chuck.
F
. 43 I
IG
NSERTING THE TOOL INTO THE COLLET CHUCK
16. Confirm the current message.
The following happens:
a. The collet chuck closes. You can release the
tool.
b. The current dialog window closes.
c. A dialog window opens.
17. Close the working chamber door.
18. Confirm the current message.
19. Activate the cooling liquid pump by
selecting the depicted icon in the Machin-
ing view in DENTALCNC.
20. Wait until the cooling liquid spray is free of air and
all jets hit the tool tip (
page
). This can take several minutes.
Fig. 44 on the facing

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis