Herunterladen Inhalt Inhalt Diese Seite drucken

poolstar POOLEX NANO ACTION Installations- Und Gebrauchsanleitung Seite 167

Vorschau ausblenden Andere Handbücher für POOLEX NANO ACTION:
Inhaltsverzeichnis

Werbung

5.0 Set up the pool
IMPORTANT:Do not start assembly if any pieces are missing. For replacement
pieces call the Consumer Service telephone number in your area.
The number of persons required for installation: 2 adult at least.
Total installation time except the time for site preparation and water filling:
45 up to 60 minutes.
Step1. Account for all parts.
Remove all the parts from the carton(s) and place them on the ground in the location
where they are to be assembled
Check each part according to "PART REFERENCE" 1.0 / 1.1. Make sure all the pieces
to be assembled are accounted for.
Step2. Install drain valves cover and stopper.
Make sure that outer drain plug is inserted into the outer drain cap and drain valve
cover is screwed on tightly.Plug the connection holes with the stoppers. (The out
drain plug changes according to different size of pool.)
STOPPER
Drain Vavle Cover
Out Drain Plug A
Out Drain Plug B
Step3. Install the U-tubes
Instal the leg extensions:
only on 1.22m models
Slide each U-tube through the bottom addition connected belt
T-joint
11
MSP-30100-V03

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis