8 Installation
B PPB 30 cable feedthrough
M Wall sleeve centre

8.1.2 Positioning of wall sleeve

NOTICE
Installation position, interior wall: Once the
plaster has been applied or wallpaper put up etc.,
the wall sleeve must end flush with the interior
wall.
Installation position, exterior wall: Wall sleeve
must protrude beyond the exterior plaster after
this plaster has been applied. Observe the follow-
ing wall sleeve projections towards the exterior
wall! The projection is needed as a drip edge
within the external cover.
Prescribed wall sleeve
projection for PP 45
RHK / PP 45 RHL
PP 45 AK
PP 45 AE
PP 45 AW
PP 45 AS
PP 45 AKR
PP 45 AKB
PP 45 LE
PPB 30 AK
PPB 30 AE
PPB 30 AW
PPB 30 AS
PPB 30 ARE
PPB 30 ARW
Wall thickness W
W + 10...15 mm
W + 0...4 mm
W + 20...25 mm
W + 5...10 mm
W + depth of the PPB
30 AE / PPB 30 AW +
5...10 mm

8.1.3 Installation of wall sleeve

NOTICE: Unit damage and damage to brick-
work caused by condensate in the event of in-
correct installation where condensate runs to-
wards the interior wall if the core hole is
drilled at too slight an incline. Mount wall
sleeve with an incline of 1...2 % to the exterior
wall so that any condensation which collects
can drain outwards. Observe the wall sleeve
projection towards the exterior wall!
WARNING Risk of injury if a wall sleeve
or external/internal cover come loose. Only
mount on walls with sufficient load-bearing
capacity. The wall sleeve must be firmly
plastered in. With PP 45 AKR/AKB, ensure se-
cure locking in the sleeve.
1. Determine installation location(s). Observe in-
stallation dimensions and minimum spacing to
the wall and ceiling. Fit empty tube/cable feed-
through.
2. Drill core hole. Observe inclines of 1 to 2 %
towards the exterior wall. Recommendation:
Drill DN 182 and align the DN 160 wall sleeve
with polystyrene shims to an incline of 1 to
2 %.
3. Shorten wall sleeve. Observe the wall sleeve
projection towards the exterior wall! Specifica-
tions for internal and exterior wall fully
plastered.
4. Deburr wall sleeve on both sides.
5. Place wall sleeve in core hole such that it pro-
trudes beyond the exterior wall. Observe the
wall sleeve projection towards the exterior
wall!
6. Close off wall sleeve on both sides with the
plaster protective covers provided.
7. For a DN 162 core hole, fix the wall sleeve
with mounting adhesive in the core hole.
8. For a DN 182 core hole, align wall sleeve and
fix on inside and outside with shims provided.
CAUTION Exercise caution when hand-
ling construction foam.
Wear protective gloves and goggles.
9. For a DN 182 core hole, fix the wall sleeve
and shim with non-compressing or zero-ex-
pansion construction foam. Cut off protruding
construction foam and shims flush with the
wall.