Herunterladen Inhalt Inhalt Diese Seite drucken

Protect The Drive And Input Power Cable - ABB ACS880-01 Kurzanleitung Für Die Installation

Vorschau ausblenden Andere Handbücher für ACS880-01:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
10 EN – USA quick installation guide

Protect the drive and input power cable

See table
A
on page
Check that the operating time of the fuse is below 0.5 seconds for frame R6 and
below 0.1 seconds for frames R7 to R9. Obey local regulations.
Install the drive on the wall
See figure
A
on page 91. For UL TYpe 12 drives: Install also the hood to the drive.
Check the insulation of the input and motor cables and the
motor
DA
Check the insulation of the input cable according to local regulations before
USA
connecting it to the drive.
DA
Check the insulation of the motor cable and motor when the cable is disconnected
from the drive, see figure
each phase conductor and the Protective Earth conductor using a measuring voltage
DE
of 1000 V DC. The insulation resistance of an ABB motor must exceed 100 Mohm
(reference value at 25 °C or 77 °F). For the insulation resistance of other motors,
ES
please consult the manufacturer's instructions. Note: Moisture inside the motor
casing will reduce the insulation resistance. If moisture is suspected, dry the motor
FI
and repeat the measurement.
FR
Connect the power cables
IT
See figures B,
motor cabling.
NL
1. Remove the front cover. UL Type 1 drives: Release the retaining clip with a
PT
screwdriver (a) and lift the cover from the bottom outwards (b).
2. UL Type 1 drives: Remove the cable entry box cover by undoing the mounting
RU
screws.
SV
3. Attach the residual voltage warning sticker in the local language next to the
control board top.
TR
4. Remove the side plates of the cable entry box.
5. Remove the shroud on the power cable terminals by releasing the clips on the
CN
sides with a screwdriver and lifting (a). If parallel cables are installed, knock out
holes for the cables (b).
6. Knock out the shrouds on the power cable terminals for the cables to be installed.
7. Fasten the cable conduits to the cable lead-through plate holes. Strip the cable
ends. Slide the cables through the connectors.
95
for the UL class T fuses for branch circuit protection per NEC.
D
on page 95. Measure the insulation resistance between
C
and
E
on pages
95
and 96. Use symmetrical shielded cable for the

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis