HEYLO DE 20 SH-U Betriebsanleitung Seite 64

Elektroheizer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Electric heater DE 20 SH-U
Installing the hot air duct
NOTICE
Connect the high-temperature hoses as needed. You have installed and connected the device.
See also
 Accessories list
[
79]
17
Commissioning
WARNING
 The device is now installed and connected.
 The device is without any externally recognizable defects; all the protective panels have been mounted.
 The operating conditions
a) Make sure that the device is not standing on a wet base and ensure that it stands upright and safe.
b) Make sure that the power cable is undamaged.
c) Insert the power plug into the socket.
 The controls will start up and the
Settings
d) Switch to the
re information, please see the section on Visualization
e) Document the commissioning.
 You have now commissioned the device.
See also
 Safety
[
48]
64 / 83
Reduced heat output
The hot air duct must be laid out correctly. Poor hose routing can result in a reduced
heat output or in the triggering of the safety temperature limiter.
a) Ensure that the maximum length (max. two hoses of 7.6 m length) of the high
temperature hoses is not exceeded (see Technical details
b) Avoid sharp bends and unnecessary lengths of hose.
Risk of burns from hot surfaces
On the exhaust side, the device covers may heat up to 60°C during operation.
a) Wear protective gloves.
[
51] for the place of installation have been met.
Operation
menu and enter the desired parameters for program phases 1-6 (if required). For mo-
menu will appear on the display.
[
67].
[
78]).