Herunterladen Inhalt Inhalt Diese Seite drucken

Preventive Maintenance - Dantherm Air Handling HCV 3 Bedienungsanleitung

Wohnungslüftungsgeräte
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Preventive maintenance

Introduction
In order for home ventilation to operate safely it is necessary to carry out preventive
maintenance, e.g. replacing filters and cleaning the unit.
Changing of
Change the filters when the filter alarm is visible on the control panel (the diode flashes
filters
yellow on and off) and the acoustic filter alarm bleeps (once every hour).
Flashes on and off
Step
Cleaning
Keep the unit clean to ensure perfect operation and good hygiene.
If the unit is filthy, e.g. around filter openings, clean with a firmly wrung dishcloth with
tepid water and detergent.
Terms for war-
The factory warranty is only valid when preventive maintenance can be proven. Preven-
ranty
tive maintenance must be carried out with a minimum interval of six months.
Documentation of maintenance should be a written log/journal. Regarding which ser-
vices needed, see the section "Preventive maintenance" in the installation guide.
1
Disconnect the power supply to the unit.
2
Open the top door and fold out the bracket for
the door.
3
Remove the insulating cover plates in front of
the filters.
Note that the smooth side of the cover plates
must be turned towards the front door.
4
Change the filters and discard the old filters in
an environment-friendly way (flammable mate-
rial).
Note the arrows on the filters – they must point
down!
The filter opening areas are for filters
only!
5
Set back the filter insulating cover plates. It is important that they face the
hard, smooth side outwards and the soft side inward.
6
Reconnect the power supply.
7
Reset the filter alarm by pushing the button for
two seconds and then close the door again.
Check that the green light-emitting diode on
the control panel alights.
Important: Chemical solvents are not allowed!
+
Action
G4 (exhaust)
G4/F7 supply air
33

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Air handling hcv 5

Inhaltsverzeichnis