External multi purge point control
If the NC-purger is connected to a multiple purge point installation, the switch
over to the next purge point should be done when the compressor is stopped. If
the compressor is stopped the previous purge cycle is finished. The next purge
cycle will start when the internal clock timer is active again.
1.
2.
3.
4.
0089393_imm_purger_Propane_german_5
01.11.2021
Connecting the "Power Connection Control Unit" shown in Abschnitt 1.5.2,
Seite 15 in order to make the NC-purger suitable for multi point purging, is
only allowed by authorized, trained electrical engineers, preferably NEN 3140
certified
Components and methods used to realize this connection must be according
EN 60204, EN 60355-1, EN 60355-2-40
Only work on the electrical wiring of het NC-purger after disconnect it from
power grid and wait for 1 minute
In order to get access to the "Power Connection Control Unit" the cover of the
NC-purger must be removed. This is done by removing the 4 screws at the
bottom region ot the longer side of the cover.