Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Of Visiano 20-2 C T1; Load Data; Shortening The Ceiling Tube; Installing The Ceiling Holder - Derungs Dmed VISIANO 20-2 C T1 Montage- Und Gebrauchsanweisungen

Untersuchungsleuchte
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
ENG
3.

ASSEMBLY of VISIANO 20-2 C T1

3.1

Load data

Bending moment M
B
Vertical weight F
G
3.2

Shortening the ceiling tube

Before shortening the ceiling tube, remove the cable
from the ceiling tube.
Use a hack saw to shorten the upper end of the ceiling
tube to the desired length, and then deburr it.
Remove the fastening screw "C".
Insert the ceiling tube "A" into the ceiling bracket "B" and
drill the ceiling holder's existing hole to 9 mm in diameter.
Drill the opposite hole separately.
Note: Pull the cable through from the lower side to the upper
pipe side (the 3-pin plug first) after sawing and drilling.
18
25Nm
90N
A
C
B

3.3. Installing the ceiling holder

Fastening hardware does not come with delivery.
DANGER
Assembly by qualified personnel
Assembly must be done by qualified personnel only.
Lack of appropriate knowledge may pose a death
hazard.
Two people are needed for assembly.
DANGER
Death hazard from falling luminaire.
The ceiling mount must only be mounted on ceilings
with a concrete stability class of B25 (C20/25) or
higher.
There should be no contact with reinforcement parts
of the solid ceiling during mounting. When in doubt, a
licensed technician must approve installation on the
specific installation surface. The load bearing capacity
of the ceiling structure must be planned, checked and
confirmed by a structural engineer beforehand.
The holes must be drilled by a professional and in
compliance with the drilling tolerances permitted by
the manufacturer of the fastening anchor. If a drilling
error occurs, such as drilling into a reinforcement bar,
a structural engineer must be consulted.
Install the luminaire such that the vertical stops are not
continuously stressed during operation.
With plaster or cladding in front of concrete, the
fastening anchor must be driven completely into the
concrete.
The screws must be tightened carefully using a torque
wrench according to the specifications of the fastening
anchor manufacturer.
DANGER
Death hazard from electric shock.
All poles of the power cable must be disconnected
from the power grid from an external lockable switch.
Draw 6 drill marks.
Observe the position of opening "A" for connecting the
current.
A

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dmed visiano 20-2 p tx

Inhaltsverzeichnis