Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Procedures - Carrier XCT7 Installations- Und Bedienungsanleitung

Hochdruck-kanal
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 86

Installation Procedures

The standard attached accessories of the units of this series refer to the packing; prepare other
accessories according to the requirements of the local installation point of our company.
1. Before installation [before finishing the installation, do not dispose off the parts included and
required for the installation]
• Determine the route to move the unit to the installation site;
• Do not tear the package open before moving the unit to the installation site. When unpacking is
needed, a soft material or protector block with ropes can be used to lift the unit to avoid
damaging or scraping of the unit.
2. Select the installation site
(1) The installation site should be selected according to the following criterion, which should be
approved by users.
• Ideal air distribution ensured; where there is no blockage in the air passage;
• where the condensed water can be drained out properly;
• where the location can structurally bear the weight of the indoor unit;
• where enough space can be ensured for maintenance.
• where the lengths of the piping between indoor units and outdoor units are within the allowable
range (refer to Installation of Outdoor Units)
• where the distance of at least 1m between indoor units, outdoor units, mains supply, connecting
wires and television or radio can be maintained so as to avoid the image disturbance and noises
of the above electrical appliances. (Even if 1m can be ensured, noise might occur if there is
strong electric wave.) Additionally, equipment, television or other valuables can't be put under the
unit so as to avoid the condensed water from the unit from dropping on the above articles,
causing damages.
(2) Height of Ceiling:
The ceiling should be located at a place, where the central
position of air outlet port is less than 3m high above the ground.
(3)Hanger bolts should be used during installation. Check if
the location can bear the weight of the unit. Reinforce it before
installation if necessary.
(4) The dimensions for maintenance
Make sure that it is easy to dismount the electrical control box,
fan, motor, filter.
(location of hanging bolt)
(dimensions of inspection hole on ceiling)
A
B
space needed for installation (unit:mm)
Model
40VD005-01
6S-7S-QEE
40VD018-03
0S-7S-QEE
checking
40VD038-05
port
4S-7S-QEE
6
D
checking
port
barrier
Size
A
B
C
D
(mm)
(mm)
(mm)
(mm)
761
1211
619
700
1161
1611
619
700
1561
2011
619
700

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis