3.1 Getting the system ready for operation

Before greasy waste water is filled into the system
➤ it must be cleaned completely (including inlets and out-
lets); solids and coarse materials must be removed.
➤ The cleaned system must be filled with cold water up to
the overflow (this is not relevant, of course, if the tanks
have been checked for airtightness and the water has
not been pumped out).

3.2 Instruction / handover

Initial operation and instruction are generally carried out by
a fitter, but they can also be carried out by someone sent by
KESSEL on request and for an extra charge.
1. The following persons should be present for the handover:
➤ Person authorised to perform the acceptance on behalf
of the building owner
➤ Sanitary fitter
In addition, we recommend the participation of
➤ Operating staff
➤ Disposal company
2. Preparation of instruction and handover:
➤ Sanitary installations must have been completed
➤ The system must be ready to be filled with water (see
section 3.1)
3. Instruction:
➤ Check the system for airtightness, transport and installa-
tion damage and check the pipe connections
➤ Information about emptying (extraction)
➤ Practical demonstration of the operating possibilities
4. Handover of installation and operating instructions
5. Drawing up the handover certificate.
Accessories can usually be retrofitted. Please address any
queries you may have to our sales department

3. Initial operation

Once the instruction has been completed, the system must
be made ready for operation again.

3.3 Handover certificate

(see page 12)
3.4 Disposal
With version G, the grease must be skimmed off daily.
Emptying intervals:
Grease separator systems must be emptied and cleaned
once a week.
Caution: Correct function can only be guaranteed if the
system content is disposed of in good time.
With version D, initial disposal must be carried out within 2-
3 weeks.
Emptying intervals:
According to DIN 4040, grease separators must be emptied
depending on quantities every 14 days, but at least once
per month, whereby the grease layer capacity of the system
is 160 mm in compliance with the standard.
Caution: Correct function can only be guaranteed if the
system content is disposed of in good time.
A disposal contract should therefore be concluded with a
professional company. If possible, disposal work should be
carried out outside business hours. When the separator
tank is opened, odour pollution must be expected.
Performing the disposal
➤ Loosen the clamping ring and take the cover off
➤ Clean the tank walls, dispose of residue grease
➤ Fill tanks with water
➤ Clean and check cover seal (renew if necessary)
➤ Close the cover with the clamping ring