SMA Solar Technology AG
Tornues STP 60-10
Parameters
A
M63 cable gland
Swivel nut of the M63 cable gland Wrench 65/68 mm
B
AC terminals
C
Primary grounding conductor
(secondary grounding conductor
directly to the right of it)
D
PV terminals
E
M32 cable gland
Swivel nut of the M32 cable gland Wrench 36 mm
F
M25 cable gland
Swivel nut of the M25 cable gland Wrench 33 mm
G
M6 equipment grounding
(equipotential bonding terminal)
Front screw (not shown)
9.5 Specifcations for Grid
Protection
Parameters
Maximum inverter current, I
Recommended type of time-lag fuse gL/gG (IEC 60269-1)
Recommended circuit breaker type B or C
Maximum fuse rating
INFORMATION
Observe local regulations.
Installation Guide
Tools
Wrench 65/68 mm
TX 30 x 50
TX 30
TX 30 x 50
Wrench 36 mm
Wrench 33 mm
TX 20
TX 30
ACmax
Tornue
6 Nm
3 Nm
14 Nm (conductor cross-section=
35 mm² to 95 mm²)
3.9 Nm
14 Nm (conductor cross-section=
35 mm² to 95 mm²)
6 Nm
1.8 Nm
10 Nm
1.8 Nm
3.9 Nm
1.5 Nm
SHP 75-10
STP 60-10
109 A
87 A
160 A
125 A
160 A
125 A
160 A
125 A
SHP75-10-STP60-10-IA-xx-19
9 Technical Data
49

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Sunny tripower 60Stp 60-10Shp 75-10

Inhaltsverzeichnis