Herunterladen Inhalt Inhalt Diese Seite drucken

SMA SUNNY HIGHPOWER PEAK1 Installationsanleitung Seite 40

Vorschau ausblenden Andere Handbücher für SUNNY HIGHPOWER PEAK1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 52
8 Service
System-Related Events
ID
Status
message
2000
2010,
2011
2012 -
2018
2030
2050
2051
2052,
2053
2054
2055
Fallback
activated
2056
Fallback
completed
40
SHP75-10-STP60-10-IA-xx-19
Description
Communication assembly is
booting.
The software update of the
main CPU has started / has
fnished.
The software update failed. Restart the software update. If
Transmission of the grid
code to the main computer
failed.
Ethernet connection is
active
Ethernet connection is
disconnected
Transmission of the Grid
Code from the SMA
Inverter Manager to the
inverter has started/ended.
Transmission of the Grid
Code from the SMA
Inverter Manager to the
inverter has failed.
The inverter switched to the
fallback mode after the
communication with the
SMA Inverter Manager
was interrupted.
The inverter has switched
back to normal operation
after having been in the
fallback mode due to a
communication disturbance
with the SMA Inverter
Manager.
Measures
-
-
an error occurs during the
update, contact Service.
If this event occurs frequently,
contact Service.
No measure necessary. This
error is used, for example, to
identify bad Ethernet cables.
No measure necessary. This
error is used, for example, to
identify bad Ethernet cables.
-
If this event occurs frequently,
contact Service.
SMA Solar Technology AG
DN
SMA S
PV
O
ervice
Line
-
-
-
-
-
-
-
x
-
-
x
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Installation Guide

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Sunny tripower 60Stp 60-10Shp 75-10

Inhaltsverzeichnis