Herunterladen Inhalt Inhalt Diese Seite drucken

SAT AE2021 Bedienungsanleitung Seite 44

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 63
4.2 Tire installation
Preinstallation preparation:
- Check and remove the dust and sand from the tire, and check whether there is metal, stone and other foreign matters;
- Check whether the tire pressure complies with the value specified;
- Check whether there is any deformation of the rim alignment plane and installation holes;
- Check whether there are foreign matters, and remove the original balance lead in the rim.
Installation mode:
There are three wheel installation methods: forward alignment, backward alignment and flange alignment specifically for large and
medium tire, these methods can be selected according to actual conditions.
1) Forward alignment
Forward alignment is a common alignment method, which is easy
for operation and mainly applicable for common steel rub and
iron hub that features minor deformation. Installation sequence:
Main
axle (rim surface
is installed
inwards)
2) Backward alignment
In case of large outer deformation of wheel, the backward
alignment can be used to ensure steel rub and main axle
alignment accuracy. The alignment method is applicable to
aluminum hub, especially, those thicker aluminum hubs, and the
measurement precision will be higher. Installation sequence:
Main
suitable
wheel
axle
cone
3) Alignment via large flange (optional)
The alignment method is applicable to large wheel installation. Installation sequence:
Main axle
large flange (fixed on main axle)
Note
Cone selected shall be suitable to the rim center hole, and its direction; otherwise it may cause incorrect
measurement.
44
AE2021
cone
opening and
closing nut
plastic
opening and
bowl
closing nut
wheel
中文
EN
large cone
quick nut
DE
RU
KO
PT
JA
ES

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis