Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Pneumatic System En - Abicor Binzel BRS-CC Einbauanleitung

Brennerreinigungsstation
Vorschau ausblenden Andere Handbücher für BRS-CC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Putting into operation
6.10 Connecting the pneumatic system
A compressed-air hose with a min. inner width of
connection plate of the assembly stand by a screw connection (not included). A shut-off valve in the supply
line is recommended. This allows the BRS-CC to be quickly and simply depressurised in order to carry out
any installation and maintenance work.
• The BRS-CC maintenance station must remain without pressure until installation is complete.
NOTICE
• The cutting capacity of the DAV wire cutting device depends on the operating pressure and the
Fig. 12
EN - 18
WARNING
welding wire used (material diameter).
Motor
off
on
and
clamping cylinder
release clamp
Z2
M
LW 6
LW4
Y2
Y1
4
2
14
12
14
5
3
1
Connecting the pneumatic system
ø
6mm is required as a supply line. This is fastened to the
Stroke cylinder
Wire cutter
open
down
up
closed
Z1
Z3
S1
LW4
LW4
LW4
Y3
4
2
4
2
14
12
5
3
5
3
1
1
LW6
BRS-CC
Injector
on
off
LW4
LW6
LW4
LW4
Y4
4
2
12
14
12
5
3
1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis