Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Maico EZQ B Serie Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für EZQ B Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EZQ.. B/D/E, DZQ.. B/D
EZS.. B/D/E, DZS.. B/D
2. Mark and drill mounting holes (3 or 4
depending on type) and insert dowels.
3. Screw fan onto square wall plate or steel
wall ring on the wall, ceiling or bracket
(tightening torque 20 Nm).
4. Lay the power cable (if necessary with
empty conduit) and fasten to the protective
grille with cable ties.
5. With free inlet (if impeller accessible)
additional protective grille (e.g. Maico
Protective Grille SG) as protection against
accidental contact and drawing in.

10 Electrical connection

Observe the relevant regulations (EN 50110-1
and EN 60204-1), in Germany especially VDE
0100 with the corresponding parts. Before
starting work on the electrical system, switch
off the mains fuse and secure it against being
switched on again (padlock).
sign in a clearly visible place.
Observe information on overload protection
chapter 5. If prescribed, use motor pro-
tection switches or thermal contacts. Do not
exceed usage temperatures.
1. Remove the connection area cover [2].
DE
Attach a warning
UK
VENTILATOREN
FR

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis