Herunterladen Inhalt Inhalt Diese Seite drucken

Maico EZQ B Serie Montage- Und Betriebsanleitung Seite 47

Vorschau ausblenden Andere Handbücher für EZQ B Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EZQ.. B/D/E, DZQ.. B/D
EZS.. B/D/E, DZS.. B/D
2. Pierce the cable grommet [6] and lead the
power cable through the grommet into the
terminal compartment. Ensure correct ca-
ble feed and tight grommet (IP 54/IP 55). If
necessary, seal the cable grommet on-site.
3. Electrically wire the fan to the terminal
block according to wiring diagram (
net) (tightening torque of screws 0.7 Nm).
Check PE conductor connection (tightening
torque of screw 1.5 Nm).
CAUTION with EZQ../EZS.. and capacitor
not installed or incorrectly installed: Motor
can start just by lightly touching the stationary
impeller
DE
Risk of injury.
UK
VENTILATOREN
Inter-
FR

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis