Herunterladen Inhalt Inhalt Diese Seite drucken

Electric Connections; Connecti Ng The Control Box - Zodiac Ei2 Montage- Und Gebrauchsanleitung

Salzelektrolysegerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 30
• The cell must always be the last element placed on the pool return pipe (see diagram).
• It is always recommended to install the cell on a by-pass. This assembly is MANDATORY if the fl ow is in
excess of 18 m³/hour to avoid load loss.
• If you installed the cell on a by-pass, it is recommended to fi t a check valve downstream from the cell
instead of a manual valve, to avoid the risk of an improper setti ng which could result in the incorrect fl ow
water back into the cell.
• Failure to locate and orient the cell in strict accordance with these instructi ons can result in a hazardous
buildup of pressurized gas which can result in serious property damage and serious injury, including loss of
life.
An "AUS" reducer and a black seal are supplied in the installati on kit. They are intended for 1 1/2" (= 38 mm)
pipes. However, the black seal can be used instead of the original seal if the pipe is not standardised (diameter
smaller than ND 50 or ND 63).
2.4 Installing the fl ow controller (Ei² Expert only)
The fl ow controller and its fi xture collar (Ø50 mm) must imperati vely be installed on the piping close to the cell and
upstream from it. Use the threaded adapter and Tefl on tape supplied to install the fl ow controller on its fi xture collar.
• Cell installed in by-pass: the fl ow controller must be installed on the cell by-pass between the upstream isolati on valve
and the cell itself.
• Cell installed in line: the fl ow controller must be installed just in front of the cell and aft er a possible valve.
• Fixer le contrôleur de débit en uti lisant uniquement l'écrou de serrage.
Écrou de
serrage
• Failure to comply with these instructi ons could lead to the destructi on of the cell! The manufacturer cannot
be held liable in this case.
• The fl ow detector has a directi on for installati on (arrow indicated on it showing the fl ow directi on
for the water). Make sure that is is correctly placed on its fi xture collar so that it stops the salt water
chlorinator producti on when fi ltering is stopped ("No fl ow" displayed showing the absence of fl ow, see "5.
Troubleshooti ng").
2.5 Electric connecti ons

2.5.1 Connecti ng the control box

The salt water chlorinator can be connected in compliance with the applicable standards in the country of installati on.
Ei² - GenSalt OE :
• Mandatory connecti on: directly interlocked with the pool fi ltrati on pump (the appliance is only supplied with power
when the pool fi ltrati on pump is operati ng).
Ei² Expert:
• Preferred connecti on: the appliance is permanently connected (hard-wired) to the power supply (power supply
protected by a 30 mA ground fault circuit breaker).
• Possible connecti on: directly coupled to the pool fi ltering (the appliance is only supplied with power when fi ltering is
operati ng).
==> When all connecti ons (electrical and hydraulic) have been made, reconnect (turn on) the mains power supply to
power on the appliance.
• Failure to comply with these instructi ons could lead to the destructi on of the cell! The manufacturer cannot
be held liable in this case.
• Whichever connecti on is used, it is mandatory to programme the Ei² Expert operati ng ti mes (called "Timers")
(see "").
EN
6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ei2 expert

Inhaltsverzeichnis