Herunterladen Inhalt Inhalt Diese Seite drucken

Benning ST 720 Bedienungsanleitung Seite 35

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

-
Otherwise, the measurement of the protective conductor resistance (R
automatic polarity reversal and the highest measured value of both measurements will be
shown on the display.
-
After the R
test has been passed, the test of the protective conductor current I
PE
carried out as permanent measurement for max. 30 seconds. Press the
early the measurement.
-
If the protective conductor current is lower than the admissible limiting value, a
shown next to the I
-
The overall test is considered to be passed, if "PASS" is shown on the display.
See figure 8:
Note on testing three-phase test objects under operating conditions:
-
The protective conductor current measurement will be carried out by means of a current
transformer in the protective conductor of the measuring adapter. The test object must be
placed onto an insulated surface. No part of the test object must have a connection to the
earth potential. Otherwise, leakage currents to earth might influence the measuring result.
-
When pressing the key 7 without previously connecting the measuring adapter to the BEN-
NING ST 720, the following warning will be shown on the display:
9.
Maintenance
Before opening the BENNING ST 720, make quite sure that it is voltage free!
Electrical danger!
Work on the opened BENNING ST 720 under voltage may be carried out only by skilled electri-
cians with special precautions for the prevention of accidents.
Make the BENNING ST 720 voltage free as follows before opening the instrument:
-
Switch the tester off.
08/ 2010
symbol.
LEAK
T esting three-phase test objects under operating conditions (test sample
placed on insulated surface)
BENNING ST 720
) will be started with
PE
will be
LEAK
key 7 to finish
will be
29

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

St-720

Inhaltsverzeichnis