Herunterladen Inhalt Inhalt Diese Seite drucken

First Operation; Electrical Diagrams - EKOM DK50-10S/M Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für DK50-10S/M:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

12. FIRST OPERATION

Check whether the compressor has been set to the operating position
Check that all compressed air line connections are secure. (see chapter 10)
Ensure electrical connections are secure and properly completed. (see chapter 11)
12.1. Switch on the compressor
Turn the power switch (22) into the "I" position on the rear side of the compressor (Fig. 1)
and the main switch (31) on the front face of the cabinet (Fig. 2)
Compressor - At first operation the air tank is pressurized until it reaches a presets level when the
compressor automatically switches off. As the air is used, the compressor works in automatic
mode, switched on or off by the pressure switch. During operation, the air dryer removes humidity
from the supplied compressed air.
The compressor is not equipped with an emergency power supply.

13. ELECTRICAL DIAGRAMS

DK50-10S/M
1/N/PE
230 V, 50/60 Hz
ELEKTRICAL OBJECT OF 1st. CAT.
01/2020
6.5 – 8 bar
19
(Fig. 3)
NP-DK50-10SM-4_01-2020

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis