Herunterladen Inhalt Inhalt Diese Seite drucken

S Pare Parts; R Epair; Arranty; S Torage - SUHNER ABRASIVE ROTOset 25-R Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für ROTOset 25-R:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12
Pull shaft core out of protective tubing. Remove old shaft
grease. Lubricate shaft core with shaft grease only lightly
(1 kg can, order no. 904 832). Replace worn shaft core
(see SUHNER catalogue). Keep hose coupling in clean
- lightly greased condition. Replace worn couplings (see
SUHNER catalogue).
4.2 s
pAre pArts
See page 2-3.
4.3 r
epAir
If the machine strict observance of the manufacturing and
testing method the tool should happen to fail, it must be
repaired by an authorized SUHNER agency.
Any replacement needed for the connecting line must be
installed by the manufacturer or its agent if safety risks are
to be eliminated.
4.4 w

ArrAnty

In the event of the tool being improperly handled, used
for purposes for which it is not intended and/or of the ser-
vice and maintenance instructions not being observed by
non-authorized persons, no warranty shall be in effect for
damages/consequential damages. Complaints can only
be honored if the machine is returned in the undisassem-
bled condition.
4.5 s
torAge
Temperature range: -15°C to +50°C
Max. relative air humidity: 90% at +30°C, 65% at +50°C
4.6 d
/ e
isposAl
nVironmentAl compAtiBility
This machine consists of materials which can be dis-
posed of in a recycling process.
Before disposal, render the machine unusable.
Do not throw the machine into the garbage collec-
tion.
According to national regulations this machine
must be recycled in an environmentally-friendly manner.
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis