Herunterladen Inhalt Inhalt Diese Seite drucken

NSK Pana-Max2 M4 Bedienungsanleitung Seite 8

Air turbine
Vorschau ausblenden Andere Handbücher für Pana-Max2 M4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
4. Connection & Disconnection of the Handpiece
Refer to Operation Manuals of coupling and hose before connecting the
handpiece.
Pana-Max2 PTL
(1) Connection
1) Insert the handpiece into the Coupling. (Fig.2)
2) Make sure the handpiece is firmly connected to the coupling.
(2) Disconnection
Pull back the Retention Lock Ring and remove the handpiece from the
Coupling. (Fig.3)
Pana-Max2 M4/Pana-Max2 B2
(1) Connection
1) Insert the handpiece correctly into the hose connector and tighten
the hose nut. (Fig.4)
2) Make sure the handpiece is connected firmly to the hose.
(2) Disconnection
Loosen the Hose Nut and remove from the Hose. (Fig.5)
Pana-Max2 QD
(1) Connection
1) Insert the coupling into the hose connector and tighten the hose
nut. (Fig.6)
2) Insert the handpiece to the coupling while pulling back the
retention lock ring of the coupling. Release the retention lock ring.
3) Make sure the handpiece is firmly connected to the coupling.
(2) Disconnection
Pull back the Retention Lock Ring and remove the handpiece from the
Coupling. (Fig.7)
CAUTION
Do not operate the Retention Lock Ring while under drive air
pressure. The high pressure may cause sudden release of the
handpiece from the coupling.
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis