Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Preparatory Work; Electrical - Homa GRP 56 ET Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Ensure tension on the chain, and then lift the pump in
a slow and controlled manner.
Swing the pump then over the operating space and
lower it gently. When using a suspension unit, ob-
serve chapter. 5. Commissioning.
Lower the pump to the operating point from and
make sure that the pump has a secure footing or the
coupling system is engaged correctly.
Remove the chain from the lifting device and secure
it to the safety chain, which is located at the top of
the operating room. This ensures that the chain can
not fall into the operating area and constitutes a dan-
ger to anyone.
Please note the following diagrams during installation.
No. Description
1
Chain guard
2
Chain
3
Handle
4
Pump

5.4. Initial operation

This chapter contains all the important instructions for op-
erating personnel for the safe commissioning and opera-
tion of the machine. The following information must be
strictly adhered to and checked:
Type of installation
Operating mode
Minimum/max water coverage. Immersion depth
After a long downtime, these specifications are also to
be checked and any defects are to be rectified!
The operation and maintenance manual must always
be kept with the machine, or be kept in a designated
place where it is always accessible for all of the oper-
ating personnel.
To avoid injury to persons or damage during operation of
the machine, the following points must be observed:
The initial operation may only be carried out by
qualified and trained personnel following the
safety instructions.
All staff working on the machine must receive, read,
and understand the instructions.
Activate all safety devices and emergency stop
switches before initial operation.
Electrical and mechanical adjustments may only be
performed by professionals.
This machine is only suitable for use at the specified
operating conditions.

5.5. Preparatory work

The machine has been using state of the art technology
and has been constructed so that it will operate reliably
and for long periods under normal operating conditions.
This requires, however, that you comply with all advice
and instructions. Small oil leaks from the mechanical
seal during operation are harmless, however, must be re-
moved before lowering or immersion into the pumping
medium.
Please check the following points:
Cable routing - no loops, slightly taut
Liquid temperature and immersion depth check - see
machine data sheet
If a hose is used on the discharge side, it should be
flushed before use with fresh water so that no depos-
its cause blockages
For wet installation, the sump pump must be cleaned
The pressure and suction side pipe systems are to be
clean and all slides are to be opened.
The pump casing must be flooded, i.e. it must be
completely filled with the medium and there may be
no more air in it. The venting can be done by suitable
ventilation devices in the system, or, if available, by
venting screws at the outlet nozzle.
Check the accessories, pipe system and suspension
unit for firm and correct fit
Review the present level control or dry run protection
An insulation test and a level control must be carried
out before commissioning.

5.6. Electrical

When installing and selection of electric lines and when
connecting the motor, the relevant local and VDE regu-
lations must be observed. The motor must be protected
by a motor protection circuit breaker. Connect the motor
connect as per the wiring diagram. Pay attention to the
direction of rotation! If rotation is in the wrong direction,
the machine will perform to specifications, and can be
damaged under adverse circumstances.
Check the operating voltage, and ensure there is uniform
power consumption by all phases in accordance with the
machine data sheet.
EngliSH | 35

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Grp 76 etGrp 111 et

Inhaltsverzeichnis