Herunterladen Inhalt Inhalt Diese Seite drucken

ECOLAB OGMPLUS Kurz- Betriebsanleitung Seite 31

Ovalradzähler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Start up
5
Start up
Personnel:
Protective equipment:
Personal protective equipment
DANGER!
Personal protective equipment, hereinafter referred to as PPE, is used to
protect personnel. The personnel who set up and install the pump must use
suitable PPE to protect against injury.
5.1
Determination of the meter's pulse value
The meter's pulse value (meter constant) must be determined prior to commissioning, in
order to ensure correct measurement of flow rates.
The pump's delivery rate during operation must be measured for this purpose.
1.
Fill suitable measuring glass with the fluid to be metered.
2.
Insert the suction line into the measuring glass.
3.
Start the metering pump.
4.
Perform venting of the metering system
(continue metering until the metering line and OGM
5.
Stop the metering pump.
6.
Fill the measuring vessel up to the maximum quantity.
7.
Start the metering pump and record the metering pulses of the OGM
8.
Determine the quantity removed from the measuring vessel.
9.
Refer the number of pulses counted to the quantity metered.
ð The result is the precise number of pulses per liter.
417102601 Rev. 1-12.2019
n
Mechanic
n
Qualified electrician
n
Specialist
n
Service personnel
n
Protective gloves
n
Chemical-resistant protective gloves
n
Protective eyewear
n
Safety shoes
The quantity in the measuring glass should be not less than 1/6 of the
metering rate (l/h) set on the metering pump.
The meter is suitable only for pure and clean liquids!
PLUS
If the OGM
is connected to an E60 or EcoAdd metering pump
(with electronic version), determination of pulse value is described in
the Operating Manual for the corresponding metering pump in the
"Calibration" section.
PLUS
have been vented).
16
PLUS
.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis