3.5 Geared motor installation
After installing the foundation casing, the respective lever and
release mechanisms go before the installation of the gear motor
as shown in the figure.
Note: carefully clean the bottom of the foundation casing from
dirt or cement to guarantee an even laying of the gearmotor.
3.6 Installation with CUBIC6L-CUBIC6LG
Insert lever [A] on the gearmotor and position the mechanical
stop [B] and [C] and adjust it, as shown in the figure.
B
C
3.7 Installation with CUBIC6TC
Insert pinion [A] and join the two pinions by means of the chain
[B], as shown in the figure.
Lubricate the chain and the lever mechanism as indicated in
the figure.
A
3.8 Installation with CUBIC6TIG
Fix the plate [A], then insert, fix and lubricate the gears [B], [C]
and [D]. Position the sphere [E] as shown in the figure.
3.9 CUBIC6FM-CUBIC6FMTI installation
A
It is possible to limit the travel of the wing by means of magnetic
limit switches.
Choose and install the magnetic limit switches as indicated in
the relative manual.
Make the electrical connections as shown in the control panel.
Attention: the magnetic limit switches cannot interrupt the power
supply to the
B
11
A
E
motor.
GB
D
C
B
CUBIC6 - IP1812