Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Safety - Jacuzzi Santorini pro Vorinstallationsblatt

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
- (det. A/B) as an alternative, a collection pit can be provided (P)
under the base of the spa (which will be perforated).
NOTES:
- The collection pit will be connected to the main drain pit.
- If a quick drain connection is prepared, make sure that the hole
in the base, the collection pit and its connection to the main drain
pit are large enough to permit the passage of the drain hose (see the
drawing in section).
To periodically empty the spa you can (
(det. A) connect a hose to the drain valve, first removing the
plug and screw on the fitting with its gasket.
NOTE: To open the valve, you must turn the ring nut anticlockwise
and pull it, therefore if you decide to connect the spa permanently
to the ground drainage point, we recommend you install a valve
below, bypassing the valve installed in the factory.
- (det. A/B) Quick drain
The spa draining time can be reduced by connecting the indica-
ted nozzle (on the bottom part of the spa) to the bottom drain,
as shown (det. 1-2-3). The drain hose will be connected to the
main drain pit and provided with a valve.
Heat exchanger models
4, det. C) Make a hole in the base of the spa in the indica-
(
ted point to provide power for the exchanger.
Position the pipes that power the exchanger away
from the electric power supply cable.
Make a connection between the primary circuit and the sy-
stem that supplies hot water and connect the electrical box (see
the wiring diagram, installation manual) with the devices that
control the recirculation of the hot water in the exchanger's pri-
mary circuit. For this reason, there is a normally open contact in
the electrical box - 5A MAX (see the wiring diagram, installation
manual).
Electrical preparations
The electrical connection can be made as follows:
- single-phase line (220-240V 1~)
- three-phase line consisting of two phase conductors + neu-
tral conductor (380-415V 2N~)
- three-phase line consisting of three phase conductors +
neutral conductor (380-415V 3N~)
The rated power supply voltage of the equipment is al-
ways 220-240V.
The equipment can also be installed in Countries where
the 220-240V voltage is supplied by a two-phase system. For
the connection please refer to the instruction manual.
with a suitable cross-section (220-240 V~: min. 4 mm
V~: min. 2,5 mm
VV-F.
vide a cable for connection of the pump of the spa-pak to the
box of the mini-pool.
Note: The cross-sections of the wires must take account not
3):
only the systems absorption but also the cable path and the
distances, the chosen protection systems and the specific
regulations for fixed electrical systems in force in the coun-
try where the spa is installed.
The junction box terminal board is designed for cables with
sections up to 6 mm
as required by standards, and to make connection to the elec-
trical mains easier, the electronic box is equipped with a cable
clamp M32 x1.5 mm.
also use watertight connectors at connection points. He must
also guarantee compliance with the specific current stand-
ards for systems in the country in which the spa is installed.
It is mandatory to comply with this instruction. Any other
procedure is prohibited.

Electrical safety

The Jacuzzi® spas are safe products, manufactured in compli-
ance with standards EN 60335.2.60, EN 61000, EN 55014 and
tested during production to ensure user safety.
personnel, in compliance with current national provisions.
must be permanently connected, without any intermediate
connections, to the electrical system and to the protection sys-
tem (earth system).
16
16
The installer must in any case use properly protected cables
2
), with characteristics not inferior to type H 05
Models equipped with a Performance filtering group: pro-
.
2
To ensure the degree of protection against splashes of water
The installer must comply with the above regulations, and
Installation must be carried out by qualified and authorized
It is the responsibility of the installer to select mate-
rials based on their intended use, to carry out work
properly, to check the condition of the system that
the unit will be connected to and that it ensures safe-
ty of use also concerning maintenance work and the
possibility to examine the system.
The Jacuzzi® spas are class "1" appliances and therefore they
The electrical system of the building must be provided
with a 0.03A differential switch and with an efficient
protection (earth) circuit.
Check for proper operation of the differential switch
by pressing the TEST button, which should trip.
Parts incorporating electrical components, except for
remote control devices, must be located or fixed so
2
; 380/415

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Santorini pro performanceDelfiDelfi pro performanceSantorini pro

Inhaltsverzeichnis