Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Switching On And Off; Inflation; Area Of Use - Parkside PKZ 180 C4 Originalbetriebsanleitung

Portable compressor
Vorschau ausblenden Andere Handbücher für PKZ 180 C4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

Operation

NOTE
The appliance vibrates during operation.
Therefore, always put it down during opera-
tion. There are four feet
the appliance for this purpose.
Remove the required accessories from the
carrying bag.
Switching on and off
Switching the appliance on:
Move the ON/OFF switch
"I" to switch the appliance on. The integrated
control lamp lights up.
Switching the appliance off:
Move the ON/OFF switch
"O" to switch the appliance off. The integrated
control lamp goes out.
CAUTION!
Caution! This appliance is not designed for
continuous operation. To prevent the motor
from overheating, the appliance may only be
used as follows: within a period of 10 min-
utes the appliance may only be operated at
the rated power input for 15% of the period,
in other words, 1.5 minutes. During the rest of
the time period (cooling phase 8.5 minutes),
the appliance cools down again.
Compressed air hose with quick coupler
Connecting:
Push the compressed air connector
quick coupler of the compressed air hose
the sleeve automatically springs forwards.
Cutting:
Pull back the sleeve on the quick coupler of
the compressed air hose
compressed air connector
CAUTION!
Caution! When disconnecting the quick
coupler of the compressed air hose
the coupler firmly to prevent injuries caused
by the hose flying off.
GB │ MT
42 
on the bottom of
into the position
into the position
into the
,
and remove the
.
, hold
Inflation
with adapter
Schrader valve

Area of use:

This application allows for a simple and accurate
inflation. The manometer
tire pressure. Thanks to the integrated release valve
it is possible to reduce the tire pressure if it is
too high.
ATTENTION!
The manometer
recommend that you check the tyre pressure
promptly with a suitable device at a petrol
station or motor vehicle workshop.
Ensure that the ON/OFF switch
Press the lever quick coupler
attach it.
Place the lever quick coupler
and then release the lever.
Insert the mains plug
a mains power socket.
Switch the ON/OFF switch
grated control lamp lights up.
Pull the trigger
.
Read the air pressure from the manometer
Let the trigger
off again.
Switch the ON/OFF switch
as the correct or permissible air pressure has
been reached. The integrated control lamp
goes out.
Press down the lever quick coupler
it off the valve.
Remove the mains plug
power socket.
is used to check the
is calibrated. However, we
is set to "O".
downwards to
onto the valve
of the compressor into
to "I". The inte-
to "O" as soon
and pull
from the mains
PKZ 180 C4
.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis