Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

A
B

Initial setup

Assemble grass catcher
When assembling the catcher frame, do not tighten
the hardware until the catcher is
completely assembled.
All carriage bolts are inserted from the outside
inward so that the head of the carriage bolt
contacts the bag.
All catcher parts are secured with
5/16-18 x 1" carriage bolts, lockwashers
and nuts.
1. Remove the crate and plastic cover. Remove the parts
boxes and components from the crate.
2. Install the top frame (A) in the bag (B). Thread the
top portion through the bag. The tabs should point
down as shown.
3. Assemble the front frame (G) to the bottom frame (D).
Install the shock support arms (C and F) as shown.
4. Install the rear vertical rods (E).
B- 2
C
G
(procedure continues)
D
E
F

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis