Herunterladen Inhalt Inhalt Diese Seite drucken

Lighting And Fuelling - attika V I S I O 2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57
English

lighting and fuelling

nOte!
If airsystem is connected, the valve must be open.
tIpS before firing up:
Open a door or window close to the wood burning. If there is a "storm" in the stove
coming from the chimney, it is advisable to place a screwed-up piece of newspaper be-
tween the upper baffle plate and the chimney, set the paper on fire, and wait until you
hear a "rumbling" noise in the chimney. this means that there definitely is a draught in
the chimney and you avoid smoke in the room.
"top-Down" lighting
• Open the door fully until it is locked in the open position.
• Start by placing approx. 1kg of wood (2 pcs. of wood) in the bottom of the combus-
tion chamber. place approx. 1.2 kilograms of dry firewood, split into kindling sticks,
and a couple of alcohol briquettes or similar.
• light the fire.
• Set the air damper to fully open pos. 3 (approx 15 min.), then at pos. 2.
• close the door, leaving the door ajar approx 1-2 cm.
attika
RAIS/
- User manual for VISIO
143

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

V i s i o 3

Inhaltsverzeichnis