Herunterladen Inhalt Inhalt Diese Seite drucken

Leveling The Moisture Analyzer - Denver Instrument IR-35 Betriebsanleitung

Elektronischer feuchtebestimmer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

IR 35
12
Warmup Time
To deliver exact results, the moisture analyzer
must warm up for at least 30 minutes every
time you connect it to AC power or after a
relatively long power outage. Only after this
time will the analyzer have reached the
required operating temperature.

Leveling the Moisture Analyzer

Purpose:
– To compensate for unevenness at the place
of installation
– This is particularly important for testing
liquid samples, which must be at a uniform
level in the sample pan
Always level the moisture analyzer again any
time after it has been moved to a different
location.
Extend or retract the front and/or rear leveling
feet as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional)
!
To prevent burns, allow the glass panels
to cool sufficiently before removing them
!
Do not handle the aluminum panels with
oily or greasy fingers
!
Do not scratch the aluminum panels; do
not use abrasive or corrosive substances
to clean the aluminum panels
Remove the 2 rubber caps and the 2 screws
beneath them, and then remove the panel
retainer
Remove the glass panels
Position the aluminum panels in the retainer
Fasten the aluminum panels with the retainer
and screws; replace the 2 rubber caps

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis