IR 35
12
Warmup Time
To deliver exact results, the moisture analyzer
must warm up for at least 30 minutes every
time you connect it to AC power or after a
relatively long power outage. Only after this
time will the analyzer have reached the
required operating temperature.
Leveling the Moisture Analyzer
Purpose:
– To compensate for unevenness at the place
of installation
– This is particularly important for testing
liquid samples, which must be at a uniform
level in the sample pan
Always level the moisture analyzer again any
time after it has been moved to a different
location.
Extend or retract the front and/or rear leveling
feet as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional)
!
To prevent burns, allow the glass panels
to cool sufficiently before removing them
!
Do not handle the aluminum panels with
oily or greasy fingers
!
Do not scratch the aluminum panels; do
not use abrasive or corrosive substances
to clean the aluminum panels
Remove the 2 rubber caps and the 2 screws
beneath them, and then remove the panel
retainer
Remove the glass panels
Position the aluminum panels in the retainer
Fasten the aluminum panels with the retainer
and screws; replace the 2 rubber caps