Herunterladen Inhalt Inhalt Diese Seite drucken

Filling The System; Filling The Boiler; Switching The Boiler Off; Prolonged Standstill Of The System. Frost Protection - Baxi Powr HT 1.850 Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. FILLING THE SYSTEM

IMPORTANT: Regularly check that the pressure gauge (1 - figure 17) reads out a pressure of 1 - 1.5 bar when
the central heating system is cold. Open the boiler drain cock (16 - figure 17) to reduce pressure if it is too
high. Open the filling cock to increase pressure if it too low.
Always open the filling cock very slowly to allow any air to bleed off.
If the pressure in the system drops frequently, contact an authorised service centre to have the system checked.
N.B.: Take special care when filling the heating system. In particular, open any thermostat valves in the system,
ensure the water enters slowly in order to prevent the formation of air inside the primary circuit until operating
pressure is reached. Lastly, vent any radiators in the system. BAXI declines all liability for damage deriving from
the presence of air bubbles in the primary exchanger due to the incorrect or imprecise observance of the above.

5. SWITCHING THE BOILER OFF

To shut down the boiler switch off the electrical supply to the appliance.

6. PROLONGED STANDSTILL OF THE SYSTEM. FROST PROTECTION

We recommend you avoid draining the whole system as water replacements engender purposeless and harmful
limestone deposits inside the boiler and on the heating elements.
In case the boiler is not operated during wintertime and is therefore exposed to danger of frost we suggest you
add some specific-purpose anti-freeze to the water contained in the system (e.g.: propylene glycole coupled
with corrosion and scaling inhibitors).
The electronic management of boilers includes a "frost protection" function in the central heating system which
operates the burner to reach a heating flow temperature of 30° C when the system heating flow temperature
drops below 5°C.
The frost protection function is enabled if:
* electrical supply to the boiler is on;
* the gas service cock is open;
* the system pressure is as required;
* the boiler is not blocked.

7. SERVICING INSTRUCTIONS AND GAS CHANGE

To maintain efficient and safe operation of your boiler have it checked by a Qualified Service Engineer at the
end of every operating period.
Careful servicing will ensure economical operation of the system.
Do not clean the outer casing of the appliance with abrasive, aggressive and/or easily flammable cleaners
(i.e.: gasoline, alcohol, and so on). Always isolate the electrical supply to the appliance before cleaning it (see
section 5 Turning off the boiler).
These boilers produced for natural gas can be converted to work with LPG.
Any gas change be effected by a Qualified Service Engineer.
ISTRUCTIONS PERTAINING TO THE USER
910.001.1 - EN
83

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powr ht 1.1000Powr ht 1.1200Powr ht 1.1500

Inhaltsverzeichnis