Herunterladen Inhalt Inhalt Diese Seite drucken

Derungs D med IRIS LED 10 Montage- Und Gebrauchsanweisung Seite 29

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Insert ceiling tube 1 into ceiling bracket 2 and
drill with Ø = 9mm 3. Use the existing hole in
the ceiling bearing as a guide.
Make
4
opposited
(Ø13mm), note the position of the Ø60mm drill
hole for electrical connections
Check clearances
Drill the bore holes, then blow them out using
bellows
WARNING
The
light
will
fall
incorrectly
The threaded pins must be screwed in fully and
correctly.
drill
hole
markings
if
fastening
is
done
Perform this assembly step on a flat
surface:
Loosen 4x countersunk screw M3 and remove
cover 1
Lay connecting piece 2 down flat
Pull both cables (of the arms) through the
connecting piece 2 , the cover 1 and the ceiling
conduit 3
Mount cover 1 again
Insert slide pad 4 into the groove at the top of
the connecting piece
Push ceiling conduit 3 (with boring aligned
upward) and connecting piece 2 together
Secure slide pad 4 by screwing in the threaded
pin 5 (up to the stop)
Release threaded pin 5 by a ¼ turn maximum
and check function
Also check:
Threaded pin must now be flush
ENG
29

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis