Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA 212.20.100 Betriebsanleitung Seite 14

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. Commissioning, operation
WARNING!
Physical injuries and damage to property and the
environment caused by components blowing out in the
event of a failure
In the event of a failure, the blow-out plug is ejected from the
EN
blow-out device. Due to the high energy of the components
blown out in the event of a failure and the media that can
subsequently escape, the possibility of physical injuries and
damage to property exists.
5.1 Requirements for the installation point
If the line to the measuring instrument is not adequately stable, an
instrument mounting bracket should be used for fastening.
If vibrations cannot be avoided by means of suitable installation,
instruments with case filling should be used.
For outdoor applications, the selected installation location has to be
suitable for the specified ingress protection, so that the instrument is
not exposed to impermissible weather conditions.
In order to avoid any additional heating, the instruments must not be
exposed to direct solar irradiation while in operation!
To ensure that the pressure can be safely vented in the case of failure,
instruments with blow-out device must keep a minimum distance of
20 mm from each object.
5.2 Mounting
After unpacking the instrument, a visual inspection for damage (e. g.
pointer, threads, sealing face, pressure port) must be carried out.
Depending on the application, the instrument should be filled with the
medium before screwing in, in order to ensure it functions properly.
14
It must be ensured that at no time can personnel or objects
be at the rear of the instrument.
WIKA operating instructions pressure gauge, model 2, copper alloy

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pg21bp-1Pg21bp-2213.40.100213.53.100

Inhaltsverzeichnis