Install/mounting
2.1
Application Guidelines
Basic Requirements
● Determine pipe material and dimensions.
● Select a location with the longest straight run of pipe.
● Identify upstream piping configuration (elbow, reducer, etc.).
● Avoid pressure reduction components upstream.
Additional Requirements for Gas Applications
● Pipe must be fully pressurized during set-up to achieve proper operation.
2.2
Mounting the Transmitter
Hazardous Voltage
May cause death or serious personal injury.
Disconnect power before working on this product.
Wall Mounting
The transmitter can be mounted on any wall surface including wood, metal or concrete. Use
the appropriate bolts and screws as needed for your mounting application and adhere to
local codes. (See figure below for mounting bracket locations.)
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Gas Quick Start
Operating Instructions, 1/2013, A5E02639183-AC
Note
Flowmeter Application Data menu [Pipe Configuration] parameter is preset for [Fully
Developed] flow.
WARNING
2
13