Planning before installation
Install the unit to a position where any danger to the UPS is minimized to ensure a
long service life:
Install the UPS indoors.
Leave 50cm of space on each side of the cabinet to enable cooling airflow and
ensure that the circulation of air to the ventilation slits is not obstructed.
Avoid excessively high temperature and excessive moisture
Make sure that the surface is solid and flat
Rack mount installation – requires rack mounting kit, to be purchased
separately
Identify the rail holes in the rack for positioning the cabinet. Position the rails in
the bottom of the 3U space for 6kVA units and 5U space for 10kVA units.
Slide the cabinet into the rack. (Fig.1)
If installing additional UPS units, repeat the steps above for each cabinet
Tower installation
PowerValue 11 RT 6 kVA
Carefully rotate the LCD control panel 90º to the right. (Fig.2)
Place the units to a vertical position.
Screw the supports to the sides of the unit. (Fig.3)
PowerValue 11 RT 10 kVA
Carefully rotate the LCD control panel 90º to the right in the top and bottom front
panels. (Fig.4)
Place the units to a vertical position.
Screw the supports to the sides of the unit. (Fig.5)