Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Labelling Of Operating Unit - Lenze EPM-H410 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für EPM-H410:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3

Mechanical installation

3.1

Labelling of operating unit

(
Stop!
Before opening the housing, switch off voltage supply!
Different labels can be attached to the keypad.
The labels are only accessible when the keypad is not built in.
ƒ
Ensure to have the labels ready for use before inserting the keypad into
ƒ
the mounting cut−out.
0
Fig. 3−1
Take off the housing cover
1. Loosen 0 bolts and remove housing cover.
EDBPM−H410 DE/EN/FR 4.1
Mechanical installation
back-up card
fuse 800 mA
0
MSP
l
Labelling of operating unit
0
3
h410_008
69

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis