Herunterladen Inhalt Inhalt Diese Seite drucken

Distributor (Gas) Connection Method - Mitsubishi Electric CITY MULTI PUHY-YSMF-B Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

10.5. Distributor (gas) connection
method
Taking out piping from the front direction
(1) Remove the copper cap and rubber packing attached to the pip-
ing and flange of the distributor (gas) (optional).
(2) Assemble outside the unit with the elbow (8) in the specified
shape and braze. (see Fig. 1.)
For the 600 type, braze the connecting pipe (7) also.
Brazing
Brazing
8
8Elbow
Elbow
(3) Braze the connecting pipe (4) and piping assembled in step (2)
to the distributor (gas) so that the connecting pipe is attached as
shown in Fig. 2. For assembly procedure, see Fig. 3. When braz-
ing piping, cool the brazed portion of the distributor side piping
with a dampened waste cloth to prevent heating by brazing.
Flange
Flange
4
Connecting
4Connecting
pipe
pipe
Elbow assembly
Elbow assembly
4
4Connecting pipe
Connecting pipe
Flange
Flange
(4) Connect the ø12.7 oil balance pipe to the ball valve of the vari-
able capacity unit (oil balance) and constant capacity unit.
(5) Connect the ø15.88 piping branched by the distributor (liquid) to
the ball valve of the variable capacity unit (liquid side).
(6) Insert the distributor (gas) into the variable capacity unit and con-
nect to the flange of the ball valve (gas side). (Use a socket wrench
and socket wrench extension.) When doing so, be sure to mount
the included packing between the ball valve (gas side) and flange
of the distributor.
(7) Fasten the plate of the distributor (gas) to the frame of the unit
with screws.
(8) Connect and braze the ø44.45 (ø38.1 for 600 type) gas piping
(main pipe) and ø28.58 gas pipe that connects the constant ca-
pacity unit with the distributor (gas).
8
8Elbow
Elbow
7
7Connecting pipe
Connecting pipe
Fig. 1
Distributor (gas)
Distributor (gas)
Fastening plate
Fastening plate
Fig. 2
Fastening plate
Fastening plate
Distributor (gas)
Distributor (gas)
Fig. 3
Taking out piping in the downward direction
(1) Remove the copper cap and rubber packing attached to the pip-
ing and flange of the distributor (gas) (optional).
(2) Assemble outside the unit with the elbow (8), connecting pipe
(7 for 600 type), or connecting pipe (6 for types other than 600)
in the specified shape and braze. (see Fig. 4.)
Brazing
Brazing
Brazing
Brazing
8
8Elbow
For 600
For 600
For other than 600 : 6Connecting pipe
For other than 600
(3) Braze the connecting pipe (5) and connecting piping assembled
in step (2) to the distributor (gas) outside the unit. For assembly
procedure, see Fig. 5. When brazing piping, cool the brazed por-
tion of the distributor side piping with a dampened waste cloth to
prevent heating by brazing.
5
5Connecting pipe
Connecting pile
Flange
Flange
The rest of the procedure is the same as for "Running piping from front
direction".
Caution:
When brazing, cool with a waste cloth dampened with water so that
the flange and ends of the distributor side piping don't get heated.
- Part could be damaged if not cooled sufficiently.
Elbow
7
:
Connecting pipe
: 7Connecting pipe
6
:
Connecting pipe
Fig. 4
Fastening plate
Fastening plate
Distributor (gas)
Distributor (gas)
Fig. 5
19

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

City multi puhy-p-ysmf-b

Inhaltsverzeichnis