Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting Direction For Refrigerant Piping; Noise Level - Mitsubishi Electric CITY MULTI PUHY-YSMF-B Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Down piping and down wiring precautions
When down piping and down wiring are performed, be sure that founda-
tion and base work does not block the base through holes. When down
piping is performed, make the foundation at least 150 mm high so that
the piping can pass under the bottom of the unit.
<PUHN-200/250YMF-B>
A
584
194
75
25
160
B
560
G
F
760
D
990
A Bottom piping through hole
B (bolt hole)
C (bolt hole for old models)
D (unit width)
E (unit depth)
F Bottom wiring through hole
G (bolt hole for packing)
8.3. Connecting direction for refrigerant
piping
Two connecting directions are available for refrigerant piping of the out-
door unit, bottom piping and front piping,as shown below:
A
B
A Knock-out hole
B Bottom piping
C Front piping
D Connect piping (to constant capacity unit)
Note:
In the case of bottom piping, build a 100 mm or higher foundation
so that piping will go through the bottom of the unit.
10
<PUHY-400/500YMF-B>
694
230
150
F
15
A
B
C
D
80
82
78
A
B
B
780
780
G
1760
D
1990

8.4. Noise level

PUHY-400
PUHY-500
60/61 dB (A-weighted)
A Front
B Measuring point
Measuring location: a room free from echoes and reverberations
15
(50/60Hz)
PUHN-200
PUHN-250
56 dB (A-weighted) 57 dB (A-weighted)
1m
A
B

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

City multi puhy-p-ysmf-b

Inhaltsverzeichnis