Herunterladen Inhalt Inhalt Diese Seite drucken

Inhaltsverzeichnis - Mitsubishi Electric CITY MULTI PUHY-YSMF-B Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Contents
1. Safety precautions ...................................................................... 3
1.1. Before installation and electric work ............................. 3
1.2. Before getting installed ................................................. 3
1.4. Before starting the test run ........................................... 4
2. Combination with indoor units ..................................................... 5
3. Confirmation of parts attached ................................................... 5
4. Outdoor unit configuration .......................................................... 6
5. Selection of installation site ........................................................ 6
6. Space required around unit ........................................................ 7
6.1. Individual installation .................................................... 7
7. Lifting method and weight of product .......................................... 8
8. Installation of unit ........................................................................ 9
8.1. Location of anchor bolt ................................................. 9
8.2. Installation .................................................................... 9
8.4. Noise level .................................................................. 10
9. Caution for snow and seasonal wind ........................................ 11
9.1. Snow and seasonal wind ............................................ 11
9.2. Countermeasure to seasonal wind ............................. 11
10. Refrigerant piping installation .................................................. 12
10.1. Areas of caution ......................................................... 12
10.2. Refrigerant piping system ........................................... 13
operation .................................................................... 15
10.4. Oil balance pipe connection method .......................... 18
10.5. Distributor (gas) connection method .......................... 19
10.6. How to install branch pipe .......................................... 20
10.7. Airtight test and evacuation ........................................ 21
11. Electrical work ......................................................................... 24
11.1. Caution ....................................................................... 24
11.3. Wiring transmission cables ......................................... 27
capacity ...................................................................... 33
12. Test run .................................................................................... 34
12.1. Checking before getting test run ................................. 34
12.2. Test run method .......................................................... 34
abnormality (emergency) ............................................ 38
2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

City multi puhy-p-ysmf-b

Inhaltsverzeichnis