Herunterladen Inhalt Inhalt Diese Seite drucken

Setup And Transport - LORCH M-Pro BasicPlus Bedienungshandbuch

Vorschau ausblenden Andere Handbücher für M-Pro BasicPlus:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
10

Setup and transport

Danger of injury due to the de-
vice falling over and crashing .
When transporting using mechani-
cal lifting equipment (e.g. crane,
etc.), only the hoisting points
shown here may be used. Use
suitable load-carrying equipment.
Each lifting point must be loaded
separately. Do NOT, for example
put one load strap through both
handles, as this could lead them
to be pulled together and cause
breakage!!
Do not use a fork-lift truck or simi-
lar device to lift the machine by its
housing.
Remove the gas cylinder from the
welding machine before transpor-
tation .
The machine must be transported
or set up only on firm, level sur-
faces. The maximum admissible
angle of inclination for setting up or
transporting is 10°.
- 36 -
Setup and transport
Lifting point for 4-point hoisting of the
M-Pro
minimum
1,22 m
10.13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

M-pro controlpro

Inhaltsverzeichnis