Herunterladen Inhalt Inhalt Diese Seite drucken

Ingeteam INGECON SUN 10TL Handbuch Für Montage Und Betrieb Seite 93

Vorschau ausblenden Andere Handbücher für INGECON SUN 10TL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
Installing the unit
5.
Mark the bottom fixing points, take down the inverter and drill said holes. Suspend the inverter from the
attachment plate again and screw in the two bottom attachments. The diameter of the holes are 9 mm.
6.
If you want to install a chain.
Exterior view of the unit
7.
Check that the unit properly secured.
Once the unit has been installed correctly, the connection process will begin.
Make the connections in the following order:
1.
Connection of accessories (optional).
2.
AC connection.
3.
DC connection.
It is mandatory to follow the order described above. Do not switch on the power until you have made
all the connections and closed the unit.
ABI2011IQM01_B - Installation and Operation Manual
Interior view of the unit
Ingeteam
DE
EN
ES
FR
IT
PT
93

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis