Herunterladen Inhalt Inhalt Diese Seite drucken

Ingeteam INGECON SUN 10TL Handbuch Für Montage Und Betrieb Seite 123

Vorschau ausblenden Andere Handbücher für INGECON SUN 10TL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
First connection to the grid
3.
From this menu you can select the current date and time. Upon accessing the year flashes. Change with
the keys
and
minutes and seconds.
4.
Here we select the country or regulation governing the inverter.
Once a general visual inspection, wiring check and sealing check have been carried out, connect power to the unit
(DC and AC).
In the first inverter connection a number of screens appear in which you must select, in this order, language,
country and applicable standards. After its configuration a feedback screen appears with the options selected.
After this first configuration, select Main menu > Start/Stop > Start, thus starting the inverter.
ABI2011IQM01_B - Installation and Operation Manual
. Press
to go on to select the date. Follow this process to select the day, time,
Ingeteam
DE
EN
ES
FR
IT
PT
123

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis