Herunterladen Inhalt Inhalt Diese Seite drucken

Hitachi RAI-50PPD Installations- Und Betriebshandbuch Seite 34

Indoor units system 4-way cassette - r32
Vorschau ausblenden Andere Handbücher für RAI-50PPD:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 61
INSTALLATION OF OPTIONAL AIR PANEL: P-AP56NAMS
12.6 TEST RUN
1 After completing the installation of the air panel, the test run
should be performed.
2 Perform the checking work for the louvre during the test run.
12.7 ADJUSTING LOUVRES
?
N O T E
The adequate air flow direction may differ depending on the
conditions (air conditioner's installation position, room structure or
furniture layout, etc.) If the cooling or the heating is not well, adjust
the air flow direction.
If the cooling operation is performed under the condition with over
80% humidity, dew condensation may occur at the air panel or the
louvre.
!
C A U T I O N
Do not move the louvre by hand. If moved, the louvre mechanism will be
damaged. In addition, do not apply an excessive force to the air outlet
part to prevent the breakage.
26
PMML0477 rev.0 - 07/2017
Do not move the louvre by hand. If moved, the auto-swing
mechanism will be damaged.
Louvre
Louver

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rai-60ppd

Inhaltsverzeichnis