Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Important Precautions During Installation - HBM C2 Montageanleitung

Vorschau ausblenden Andere Handbücher für C2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7

Mechanical installation

C2
7.1
Important precautions during
installation
S Handle the transducer with care.
S Comply with the requirements for the force application
parts, as specified in sections 6.3 and 6.4.
S Welding currents must not be allowed to flow over the
transducer. If there is a risk that this might happen,
you must provide a suitable low-ohm connection to
electrically bypass the transducer. HBM offers the
highly flexible EEK ground cable in various lengths for
this purpose, which can be screwed on above and
below the transducer.
S Make sure that the transducer is not overloaded.
WARNING
There is a danger of the transducer breaking if it is over­
loaded. This can cause danger for the operating person­
nel of the system in which the transducer is installed, as
well as for people in the vicinity.
Implement appropriate safeguards to avoid a force over­
shoot (also see Chapter 12 "Specifications", page 29), or
to protect against any dangers that may result.
A0674-5.0 HBM: public
Conditions on site
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis