Herunterladen Inhalt Inhalt Diese Seite drucken

Gemü CleanStar C57 HPW iComLine Original Einbau- Und Montageanleitung Seite 29

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation location:
CAUTION
Do not apply external force to the
G
diaphragm globe valve.
Choose the installation location so that
G
the diaphragm globe valve cannot be
used as a foothold (climbing aid).
Lay the pipeline so that the block valve
G
is protected against transverse and
bending forces, and also vibrations and
tension.
Only mount the diaphragm globe valve
G
between matching aligned pipes.
Direction of medium fl ow: As indicated by

the arrow on the valve body.
Mounting position of the diaphragm globe

valve: optional.
Installation:
1. Ensure the suitability of the diaphragm
globe valve for each respective use.
The diaphragm globe valve must be
appropriate for the piping system
operating conditions (medium, medium
concentration, temperature and
pressure) and the prevailing ambient
conditions. Check the technical data
of the diaphragm globe valve and the
materials.
2. Shut off plant or plant component.
3. Secure against recommissioning.
4. Depressurize the plant or plant component.
5. Completely drain the plant (or plant
component) and let it cool down until
the temperature is below the media
vaporization temperature and scalding
can be ruled out.
6. Correctly decontaminate, rinse and ventilate
the plant or plant component.
7. Installation via thread with suitable media
resistant fi ttings (not included in the
scope of delivery).
Fastening with suitable media
resistant plastic bolts (not included in
the scope of delivery)!
® Corrosion and contamination when
using metal bolts!
Installation - Flare connection:
1. Also refer to GEMÜ FlareStar
GEMÜ fl are and assembly instructions
for preparation and connection of fl are
connections!
2. Push the prepared fl ared tubing fully onto the
spigot of the fl are fi tting.
3. Screw on union nut.
4. Use connection fi ttings resistant to and
suitable for the ambient conditions.
Installation - Pillar Super 300 Type
connections:
1. Preparation of the tube by mounting
the sleeve (observe manufacturer's
instructions: www.nipponpillar.com/
Download/Fittings/S-300 Instruction
manual).
2. Push together Pillar Super 300 Type
connection with prepared tube.
3. Tighten Pillar Super 300 Type union nut.
Installation - PrimeLock connections:
1. Preparation of the tube by mounting
the sleeve (observe manufacturer's
instructions:
www.entegrisfl uidhandling.com/
Product.aspx?G=1905.
2. Push together PrimeLock connection with
prepared tube.
3. Tighten PrimeLock union nut.
29 / 44
CAUTION
®
brochure and
C57 HPW

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis