Herunterladen Inhalt Inhalt Diese Seite drucken

ABB TTF300 Inbetriebnahmeanleitung Seite 65

Für feldmontage
Vorschau ausblenden Andere Handbücher für TTF300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
4.6.1.2
ATEX - Zone 1 (0)
Transmitter design: II 2 (1) G Ex [ia] ib IIC T6
Zone 0 or Zone 1
Fig. 18
A Sensor
B Transmitter TTF300
The input for the supply isolator must have an [Ex ib] design.
As the user, it is your responsibility to ensure that the sensor instrumentation meets the
requirements of applicable explosion protection standards. The sensor can be installed in Zone
1 or Zone 0.
4.6.1.3
ATEX - Zone 1 (20)
Transmitter design: II 2 G (1D) Ex [iaD] ib IIC T6
Zone 0 or Zone 1 or
Fig. 19
A Sensor
B Transmitter TTF300
The input for the supply isolator must have an [Ex ib] design.
As the user, it is your responsibility to ensure that the sensor instrumentation meets the
requirements of applicable explosion protection standards. The sensor can be installed in Zone
0, Zone 1, or Zone 20.
CI/TTF300-X1
J
A
Zone 20
ia
J
A
Ex area Zone 1
D
ia
ia
B
C Supply isolator [Ex ib]
D Interface for LCD indicator
Ex area Zone 1
D
ia
B
C Supply isolator [Ex ib]
D Interface for LCD indicator
TTF300
Electrical connections
Safe area
ib
C
A00127
Safe area
ib
ib
C
A00128
EN - 27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis