Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installation Site - clage DEX ELECTRONIC MPS Serie Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. Installation

Based on the national constitution guidelines
a general test certificate concerning the evi-
dence of applicability of noise behaviour is
granted.
The following regulations must be observed:
• VDE 0100
• EN 806
• Installation must comply with all statutory regulations, as well as those of the
local electricity and water supply companies.
• The rating plate and technical specifications
• Only intact and appropriate tools must be used

Installation site

• Appliance must only be installed in frost-free rooms. Never expose appliance to
frost.
• The Appliance must be wall mounted and has to be installed with water connectors
downward.
• The appliance complies with protect-ion type IP25 and may therefore be installed in
protection zone 1 according to VDE 0100 part 701.
• In order to avoid thermal losses, the distance between the instantaneous water
heater and the tapping point should be as small as possible.
• For maintenance work, a shut-off valve should be installed in the supply line. The
appliance must be accessible for maintenance work.
• Plastic pipes may only be used if they conform to DIN 16893, Series 2. The hot water
pipes must be thermally insulated.
• The specific resistance of the water must be at least 1100 Ω cm at 15 °C. The specific
resistance can be asked for with your water distribution company.
23
CLAGE
EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis