Herunterladen Inhalt Inhalt Diese Seite drucken

Kessel Comfort PLUS Originalbetriebsanleitung Seite 45

Vorschau ausblenden Andere Handbücher für Comfort PLUS:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Connect the mains cable 400V (
• Lay the connection cable through the housing openings up to the terminal
clamps and main switch.
• Establish the connections in accordance with the connection diagram (in the
housing cover of the control unit).
• Tighten the cable screw connection so that the seal is guaranteed.
Mains cable 230V
• The control units are ready to plug in
Installing the control unit for the redundant flap (option)
When used with Pumpfix/Ecolift XL in the version with two motor-driven flaps,
connect the redundant connection in accordance with the instructions for the
redundant control unit to the terminal block "LIN-BUS".
010-700_01
"Fig. [3]")
Installation and operating manual
PE N
T1 T2 T3
Connection overview for the mains cable 400V
Fig. [3]
Connection
Type of
Source
cable
conductor
Protective
earth
Neutral
Mains
5-pole
Phase
Phase
Phase
5
Connection
Label
name
yellow/green
PE
blue
N
L1
T1
L2
T2
L3
T3
45

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis